Skip to stories
Search
Main Edition
Colorado Independent news

Search

Society Colorado

Federal agency confirms $9.1 million for southwest Colorado flood repairs

The latest emergency installment includes $600,000 for eligible county roads. Drivers between Durango and Pagosa Springs still face a detour around the closed Piedra River bridge.

Archive photo. Colorado Highway 151 north of Arboles in October 2024. · Jeffrey Beall / Wikimedia Commons (CC BY 4.0)
Archive photo. Colorado Highway 151 north of Arboles in October 2024. · Jeffrey Beall / Wikimedia Commons (CC BY 4.0)

The Federal Highway Administration said Tuesday that $9.1 million was immediately available to repair roads and bridges damaged by two rounds of flooding in southwest Colorado. The Colorado Department of Transportation announced the approval Monday, as crews worked to restore routes before winter.

The federal agency put the total emergency relief at $19.6 million. Its first funding notice shows where the difference comes from. That round provided $6.5 million to CDOT and $4 million to the U.S. Forest Service. With the new installment, CDOT’s share of the two rounds is $15.6 million.

CDOT says $600,000 of the latest installment is for eligible county roads, equal to a tenth of its preliminary $6 million local-road damage estimate. State and county officials still have to identify which repairs qualify. The Durango Herald reported Tuesday that La Plata County did not yet know how much it would receive.

For drivers between Durango and Pagosa Springs, Colorado Highway 151 is back open as part of a detour through Ignacio. KSUT reported that it reopened Monday night. The direct route on U.S. 160 remains closed at the Piedra River bridge. CDOT’s travel advisory directs drivers via Colorado Highways 151 and 172 and advises extra time for ongoing work.

Archive photo by Jeffrey Beall via Wikimedia Commons, resized under CC BY 4.0.

This post is available in the following languages:

Link